Public Environmental Review Boodarie Waste to Energy and Materials Recovery Facility – Port Hedland
10 August 2012
Public Review Period 13/8/12 – 10/9/12
New Energy is planning to develop a waste to energy and materials recovery facility for the Boodarie Estate, Port Hedland.
A Public Environmental Review (PER) has been prepared by the company to examine the environmental effects associated with the proposed development, in accordance with Western Australian Government procedures. The PER describes the proposal, examines the likely environmental effects and the proposed environmental management procedures.
The PER is available to download above. For the full list of downloads including appendices, click here.
Public Submissions close on 10/9/12.
The EPA prefers submissions be made electronically using one of the following:
By email to submissions@epa.wa.gov.au
By email to the officer ann.stubbs@epa.wa.gov.au
Alternatively submissions can be posted to:
- Chairman, Environmental Protection Authority
Locked Bag 33, Cloisters Square, WA 6850,
Attention: Ms Ann Stubbs - Delivered to the Environmental Protection Authority,
Level 4, The Atrium, 168 St Georges Tce, Perth,
Attention: Ms Ann Stubbs - Faxed to 6467 5556
If you have any questions on how to make a submission, please ring the EPA assessment officer, Ann Stubbs, on (08) 6467 5409.
Copies of the PER may be purchased for $10 from:
New Energy Corporation
Suite 1, 12 Parliament Place West Perth,
WA, 6005 Phone: (08) 9226 0722
A CD version of the PER can be obtained from the above address.
Copies of the PER will be available for examination at the Port Hedland and South Hedland public libraries and State/Battye libraries and;
Department of Environment and Conservation
Library/Reading Room,
4th Floor, The Atrium,
168 St Georges Tce Perth, WA 6000
Full list of PER Downloads
- PER Boodarie Waste to Energy and Materials Recovery Facility Port Hedland (14 MB, PDF)
- Appendix 1 EPA Environmental Scoping Document (3.5 MB, PDF)
- Appendix 2 Entech Comparative Emissions Study (540 KB, PDF)
- Appendix 3 REMPLAN Economic Impact Modelling (846 KB, PDF)
- Appendix 4 PER Process (99 KB, PDF)
- Appendix 5 Section 91 Licence (1 MB, PDF)
- Appendix 6 DSD Letter of In Principle Support (2.9 MB, PDF)
- Appendix 7 Landcorp Board Approval Letter (1.7 MB, PDF)
- Appendix 8 Entech Preliminary Design Package 120 (8.6 MB, PDF)
- Appendix 8 Entech Preliminary Design Package (12 MB, PDF)
- Appendix 9 Proposed Site Levels and Water Management (183 KB, PDF)
- Appendix 10 List of Questions Raised During Consultation (370 KB, PDF)
- Appendix 11 Flora and Vegetation Database Search Results (306 KB, PDF)
- Appendix 12 Fauna Database Search-Results (317 KB, PDF)
- Appendix 13 Air Quality impact Assessment Synergetics 2012 (1 MB, PDF)
- Appendix 14 Aboriginal Heritage Inquiry System Search Results (121 KB, PDF)
- Appendix 15 Acoustic Assessment Report Herring Storer 2012 (5.1 MB, PDF)
- Appendix-16 Odour Assessment The Odour Unit 2012 (4.9 MB, PDF)
- Appendix 17 Notes from Meeting with Department of Health Toxicology Group (339 KB, PDF)
- Appendix 18 Nanoparticle Literature Review Synergetics 2012b (590 KB, PDF)
- Appendix 19 Greenhouse Gas Emissions Calculations (134 KB, PDF)